MBA4U.in - CAT DILR Practice Set 6
20 Original CAT-Level Data Interpretation & Logical Reasoning Questions | Static Paper
Questions | Suggested Time | MCQ | TITA | Difficulty Mix |
20 | 40 minutes | 10 | 10 | 4 Easy | 11 Moderate | 5 Difficult |
Instructions
- This is a static practice paper prepared for MBA4U.in; there are no interactive response fields.
- Attempt all four sets within a 40-minute sectional limit before consulting the answer key and detailed solutions.
- MCQ: +3 for a correct answer and -1 for an incorrect answer. TITA/non-MCQ: +3 for a correct answer and no negative marking.
- Difficulty labels are included only for practice analytics. All datasets and questions are freshly written and copyright-safe.
SET 1: Courier Hubs – Manual Inspection and Rework Load
Five courier hubs A, B, C, D and E process parcels during one shift. The table gives parcels handled, the percentage sent for manual inspection, the percentage of manually inspected parcels that require rework, the minutes spent on each manual inspection, and the additional minutes spent on each reworked parcel. All percentages apply exactly.
Hub | Parcels | Manual inspect (%) | Rework of manual (%) | Minutes/manual | Extra min/rework |
A | 1200 | 20 | 25 | 4 | 3 |
B | 1500 | 16 | 20 | 5 | 4 |
C | 1000 | 25 | 12 | 6 | 5 |
D | 1800 | 10 | 30 | 5 | 4 |
E | 1400 | 15 | 20 | 4 | 6 |
Q1. How many parcels in total are sent for manual inspection across the five hubs? [TITA | Easy]
Q2. Which hub has the largest number of parcels requiring rework? [MCQ | Moderate]
- A
- B
- C
- D
Q3. What is the combined staff time, in minutes, spent on manual inspection and rework at hubs A and C? [TITA | Easy]
Q4. At hub B, the manual-inspection rate falls from 16% to 12%, while all other rates and times remain unchanged. How many staff-minutes are saved? [TITA | Moderate]
Q5. Hub D handles 25% more parcels, keeps its manual-inspection rate unchanged, and reduces the rework rate among manually inspected parcels from 30% to 20%. What is its new total staff time for manual inspection and rework? [MCQ | Difficult]
- 1,260 minutes
- 1,285 minutes
- 1,305 minutes
- 1,325 minutes
SET 2: Innovation Expo – Hexagonal Booth Placement
Six exhibitors A, B, C, D, E and F occupy six booths numbered 1 to 6 around a hexagonal hall in clockwise order. Booths 1 and 4 are opposite each other; booths 2 and 5 are opposite; booths 3 and 6 are opposite. Adjacent booth numbers are consecutive, with booths 1 and 6 also adjacent. The following conditions hold:
- A is in booth 1.
- D is in booth 4.
- B and C occupy adjacent booths.
- E is not adjacent to A.
- F is not adjacent to D.
Q6. After applying all placement rules, what is the size of the feasible arrangement set? [TITA | Difficult]
Q7. Which exhibitor cannot occupy booth 3 in any valid arrangement? [MCQ | Easy]
- B
- C
- E
- F
Q8. If C occupies booth 2, which booth must B occupy? [TITA | Moderate]
Q9. Apart from B and C, which pair of exhibitors must always occupy adjacent booths? [MCQ | Difficult]
- A and F
- D and E
- E and F
- A and B
Q10. If E occupies booth 3, what is the sum of the booth numbers occupied by B and C? [TITA | Moderate]
SET 3: Podcast Advertising – Completion, Fill Rate and Revenue
Five podcast episodes A, B, C, D and E have the following performance data. Downloads are measured in thousands. A completed listener is a download counted by the completion percentage. Each completed listener is exposed to the listed number of ad slots. The fill rate is the percentage of those ad slots actually sold. Revenue equals filled ad impressions (in thousands) multiplied by the CPM value shown in rupees.
Episode | Downloads (000) | Completion (%) | Ad slots | Fill rate (%) | CPM (Rs) |
A | 100 | 80 | 3 | 75 | 200 |
B | 120 | 75 | 2 | 80 | 250 |
C | 90 | 90 | 4 | 50 | 180 |
D | 150 | 60 | 3 | 90 | 220 |
E | 80 | 85 | 2 | 100 | 300 |
Q11. What is the total number of completed-listener sessions across all five episodes, in thousands? [TITA | Easy]
Q12. Which episode generates the largest number of filled ad impressions? [MCQ | Moderate]
- A
- B
- D
- E
Q13. What is the combined advertising revenue from episodes A and B, in rupees? [TITA | Moderate]
Q14. Episode C raises its fill rate from 50% to 75%, with all other values unchanged. How much additional advertising revenue does it earn? [MCQ | Moderate]
- Rs 12,960
- Rs 13,770
- Rs 14,580
- Rs 15,390
Q15. For episode D, the completion rate rises from 60% to 70%, but the CPM falls by 10%; the number of downloads, ad slots and fill rate remain unchanged. By what percentage does D’s advertising revenue change relative to its original revenue? [MCQ | Difficult]
- It falls by 5%
- It is unchanged
- It rises by 5%
- It rises by 10%
SET 4: Laboratory Calibration – Order and Technician Assignment
Five instruments J, K, L, M and N are calibrated one per day from Day 1 to Day 5. Each calibration is handled by technician X or technician Y. Exactly three instruments are handled by X and two by Y. The following conditions apply:
- J is calibrated before M.
- K and L are not calibrated on consecutive days.
- N is calibrated immediately after K.
- M is not calibrated on Day 5.
- J and L are handled by the same technician.
- M and N are handled by different technicians.
Q16. When both day order and technician assignment are counted, what is the size of the feasible schedule set? [TITA | Difficult]
Q17. Which instrument must be handled by technician Y in every valid complete schedule? [MCQ | Moderate]
- J
- K
- M
- N
Q18. Which instrument cannot be calibrated on Day 1 in any valid schedule? [MCQ | Moderate]
- J
- K
- L
- M
Q19. If J is calibrated on Day 3, which instrument must be calibrated on Day 2? [MCQ | Moderate]
- K
- L
- M
- N
Q20. Under the additional condition that technician Y handles M, how many feasible complete schedules remain? [TITA | Moderate]
Answer Key
Question | Answer | Question | Answer |
1 | 1120 | 11 | 409 |
2 | A | 12 | C |
3 | 2790 | 13 | 72000 |
4 | 348 | 14 | C |
5 | C | 15 | C |
6 | 4 | 16 | 10 |
7 | D | 17 | B |
8 | 3 | 18 | D |
9 | C | 19 | D |
10 | 11 | 20 | 5 |
Detailed Solutions
Q1. Answer: 1120. Manual-inspection counts are A=240, B=240, C=250, D=180 and E=210. Their total is 1,120 parcels.
Q2. Answer: A. Rework counts are A=60, B=48, C=30, D=54 and E=42. Hub A is largest, so option A.
Q3. Answer: 2790. Hub A uses 240×4 + 60×3 = 1,140 staff-minutes. Hub C uses 250×6 + 30×5 = 1,650 staff-minutes. Combined time = 2,790 minutes.
Q4. Answer: 348. At 12%, B manually inspects 180 parcels. Rework remains 20%, so 36 require rework. New time =180×5 + 36×4 =1,044 minutes, compared with 1,392 originally. Saving =348 minutes.
Q5. Answer: C. D now handles 2,250 parcels. Ten percent, or 225, are manually inspected; 20% of these, or 45, require rework. Total time =225×5 + 45×4 =1,305 minutes, so option C.
Q6. Answer: 4. With A fixed at booth 1 and D at booth 4, exhaustive enumeration leaves exactly four valid arrangements by booths 1-6: A-B-C-D-E-F; A-C-B-D-E-F; A-F-E-D-B-C; and A-F-E-D-C-B. Thus the count is 4.
Q7. Answer: D. Across the four valid arrangements, booth 3 is occupied by B, C or E, but never by F. Hence D.
Q8. Answer: 3. If C is in booth 2, the only valid arrangement is A-C-B-D-E-F, so B must be in booth 3.
Q9. Answer: C. In every valid arrangement E and F are adjacent: either E5-F6 or F2-E3. Thus C.
Q10. Answer: 11. If E is in booth 3, then B and C occupy booths 5 and 6 in some order. Their booth-number sum is therefore 11.
Q11. Answer: 409. Completed listeners are A=80, B=90, C=81, D=90 and E=68 thousand. Total =409 thousand.
Q12. Answer: C. Filled ad impressions, in thousands, are A=180, B=144, C=162, D=243 and E=136. Episode D is highest, corresponding to option C.
Q13. Answer: 72000. Episode A revenue is 180×200=Rs 36,000 and episode B revenue is 144×250=Rs 36,000. Combined revenue =Rs 72,000.
Q14. Answer: C. The 25-percentage-point rise in fill rate adds 90×0.90x4x0.25=81 thousand filled impressions. At Rs 180 CPM, extra revenue is 81×180=Rs 14,580, so C.
Q15. Answer: C. Original D revenue is 150×0.60x3x0.90×220=Rs 53,460. New revenue is 150×0.70x3x0.90×198=Rs 56,133. The increase is Rs 2,673, which is exactly 5% of Rs 53,460. Hence C.
Q16. Answer: 10. There are five feasible day orders under the ordering rules. For each, J and L must both be X, K is forced to Y by the three-X requirement, and M/N may take the remaining X/Y assignment in two ways subject to being different. Hence 5×2=10 complete schedules.
Q17. Answer: B. J and L must be handled by the same technician. If both were Y, there would be no way to assign exactly three instruments to X while also making M and N different. Therefore J and L are X, and K is forced to Y in every valid schedule. Hence B.
Q18. Answer: D. M cannot be Day 1 because J must occur before M. J, K and L each appear on Day 1 in at least one feasible schedule. Therefore D.
Q19. Answer: D. When J is on Day 3, the ordering conditions force K on Day 1 and N immediately after it on Day 2; M is Day 4 and L Day 5. Hence N, option D.
Q20. Answer: 5. There are five feasible day orders. If M is Y, then N must be X, while J and L are X and K is Y. This technician assignment is fixed for each day order, so 5 complete schedules remain.