MBA4U.in - CAT DILR Practice Set 01

MBA4U.in - CAT DILR Practice Set 01

20 Original CAT-Level Data Interpretation & Logical Reasoning Questions

Static practice set | 4 sets × 5 questions | 10 MCQ + 10 TITA

Questions 20
Suggested time 40 minutes
Marking for practice MCQ: +3/-1; TITA: +3/0
Difficulty mix Easy, Moderate and Difficult

Instructions

Read the data/conditions for each set carefully. Questions within a set share the same information.

For MCQ questions, choose one option. For TITA questions, enter only the required numerical value.

Use the set as timed CAT practice. Detailed solutions appear only after all 20 questions.

All questions and datasets in this practice set are freshly written for MBA4U.in and are not reproductions of CAT questions.

SET 1: Fulfilment Centres - Order Processing - Overall difficulty: Easy to Moderate

Five fulfilment centres A, B, C, D and E processed online orders during the same week. The table gives the total number of orders, the percentage processed for same-day dispatch, and, among the orders not processed for same-day dispatch, the percentage that were delayed beyond the promised delivery window. Assume all percentages apply exactly.

Centre Total orders Same-day dispatch (%) Delayed among non-same-day (%)
A 1000 40 10
B 1200 35 20
C 900 50 20
D 1500 30 10
E 800 45 25

An order is called on-time if it was either dispatched the same day or, despite not being dispatched the same day, was not delayed beyond the promised window.

Q1. [TITA] [Easy]
What is the total number of delayed orders across all five centres?

Q2. [MCQ] [Moderate]
Which centre has the highest percentage of on-time orders?

A. Centre A

B. Centre B

C. Centre C

D. Centre D

Q3. [TITA] [Moderate]
By how many does the total number of same-day-dispatch orders exceed the total number of delayed orders?

Q4. [MCQ] [Moderate]
If Centre E reduces its delay percentage among non-same-day orders from 25% to 10%, while all other figures remain unchanged, how many additional orders become on-time?

A. 44

B. 55

C. 66

D. 72

Q5. [TITA] [Moderate]
The numbers of delayed orders at Centres B and D are in the ratio a:b in lowest terms. What is a + b?

SET 2: Six Workshops - Scheduling - Overall difficulty: Moderate to Difficult

Six workshops A, B, C, D, E and F are scheduled in six consecutive slots numbered 1 to 6, one workshop per slot. The following conditions apply:

  • A is scheduled before D.
  • B and E are not scheduled in consecutive slots.
  • C is scheduled either in slot 2 or in slot 5.
  • F is scheduled after B.
  • A and C are not scheduled in consecutive slots.
  • D is scheduled exactly two slots after E.

Q6. [TITA] [Difficult]
Determine the number of feasible full timetables.

Q7. [MCQ] [Moderate]
Which of the following must be true in every valid schedule?

A. B is before C

B. A is before B

C. F is before E

D. C is before E

Q8. [TITA] [Moderate]
If C is scheduled in slot 5, how many complete schedules are possible?

Q9. [TITA] [Difficult]
If E is scheduled in slot 4, how many complete schedules are possible?

Q10. [MCQ] [Moderate]
Which of the following workshops can be scheduled in slot 1?

A. C

B. D

C. F

D. A

SET 3: Solar Plants - Net Generation - Overall difficulty: Moderate

Five solar plants P, Q, R, S and T report their annual gross generation, the percentage of gross generation consumed internally by plant equipment, and an additional outage loss.

Net generation = Gross generation × (1 - internal-consumption %) - outage loss

Plant Gross generation (GWh) Internal consumption (%) Outage loss (GWh)
P 500 4 20
Q 600 5 30
R 450 2 21
S 700 10 35
T 550 6 22

Q11. [MCQ] [Easy]
Which plant has the highest net generation?

A. P

B. Q

C. R

D. S

Q12. [TITA] [Moderate]
What is the combined net generation, in GWh, of all five plants?

Q13. [TITA] [Moderate]
If Plant P increases its gross generation by 10% while its internal-consumption percentage and outage loss remain unchanged, by how many GWh does its net generation increase?

Q14. [MCQ] [Moderate]
Which plant converts the greatest percentage of its gross generation into net generation?

A. P

B. R

C. S

D. T

Q15. [TITA] [Moderate]
If the outage loss at Plant S doubles, with all other figures unchanged, by how many GWh would its resulting net generation exceed that of Plant Q?

SET 4: Service Hubs - Route Network - Overall difficulty: Moderate to Difficult

A service company operates six hubs A, B, C, D, E and F. Travel is possible in both directions on each direct link shown below. The number beside each link is the travel time in hours. A route may not visit the same hub more than once.

Direct link Travel time
A-B4
A-C6
B-C2
B-D5
B-E7
C-D3
C-E4
D-E2
D-F6
E-F3

Q16. [TITA] [Moderate]
What is the minimum travel time from A to F?

Q17. [MCQ] [Difficult]
How many distinct A-to-F routes use at most four direct links?

A. 8

B. 10

C. 12

D. 14

Q18. [MCQ] [Moderate]
If hub C is unavailable, what is the minimum travel time from A to F?

A. 13

B. 14

C. 15

D. 16

Q19. [MCQ] [Difficult]
Which pair of intermediate hubs occurs on every minimum-time route from A to F?

A. B and C

B. C and D

C. C and E

D. D and E

Q20. [MCQ] [Difficult]
If a route from A to F must visit both D and E, in either order, what is the minimum possible travel time?

A. 13

B. 14

C. 15

D. 16

Answer Key

Q Ans Q Ans Q Ans Q Ans
1521 2A 31559 4C
587 66 7A 84
94 10D 11D 122510
1348 14B 1520 1613
17C 18B 19C 20B

Detailed Solutions

Q1. Delayed orders: A = 1000 × 60% × 10% = 60; B = 1200 × 65% × 20% = 156; C = 900 × 50% × 20% = 90; D = 1500 × 70% × 10% = 105; E = 800 × 55% × 25% = 110. Total = 521.

Q2. On-time percentage = 100% - delayed orders as a percentage of total orders. A: 94%; B: 87%; C: 90%; D: 93%; E: 86.25%. The highest is Centre A. Answer: A.

Q3. Same-day orders = 400 + 420 + 450 + 450 + 360 = 2080. Delayed orders = 521. Required difference = 2080 - 521 = 1559.

Q4.At E, non-same-day orders = 800 × 55% = 440. Reducing the delay rate from 25% to 10% saves 15% of 440 = 66 orders. Answer: C.

Q5. Delayed orders at B and D are 156 and 105. Their ratio is 156:105 = 52:35. Hence a + b = 87.

Q6. The six valid schedules are: ABFECD, BAFECD, BCEADF, BCFEAD, BFAECD and EADBCF. Hence there are 6 valid schedules.

Q7. Checking all six valid schedules shows B always occurs before C. The other statements fail in at least one schedule. Answer: A.

Q8. Four valid schedules have C in slot 5: ABFECD, BAFECD, BFAECD and EADBCF. Therefore the answer is 4.

Q9. The schedules with E in slot 4 are: ABFECD, BAFECD, BCFEAD and BFAECD. Therefore 4 schedules are possible.

Q10. The first workshop can be A, B or E across the valid schedules. Among C, D, F and A, only A can occupy slot 1. Answer: D.

Q11. Net generation:
P = 500 × 0.96 - 20 = 460
Q = 600 × 0.95 - 30 = 540
R = 450 × 0.98 - 21 = 420
S = 700 × 0.90 - 35 = 595
T = 550 × 0.94 - 22 = 495

The maximum is Plant S. Answer: D.

Q12. Combined net generation = 460 + 540 + 420 + 595 + 495 = 2510 GWh.

Q13. New gross generation at P = 550 GWh.
New net = 550 × 0.96 - 20 = 508 GWh.
Original net = 460 GWh.
Increase = 48 GWh.

Q14. Net as a percentage of gross:
P = 92%
Q = 90%
R = 420/450 = 93.33%
S = 85%
T = 90%

The largest is Plant R. Answer: B.

Q15. If S outage loss doubles to 70 GWh:
New net = 700 × 0.90 - 70 = 560 GWh.
Plant Q remains at 540 GWh.
Difference = 20 GWh.

Q16. A-C-E-F takes:
6 + 4 + 3 = 13 hours.

Another minimum route is A-B-C-E-F:
4 + 2 + 4 + 3 = 13 hours.

Therefore the minimum travel time is 13 hours.

Q17. The 12 simple A-F routes using at most four links are:
A-B-C-D-F
A-B-C-E-F
A-B-D-E-F
A-B-D-F
A-B-E-D-F
A-B-E-F
A-C-B-D-F
A-C-B-E-F
A-C-D-E-F
A-C-D-F
A-C-E-D-F
A-C-E-F

Therefore there are 12 routes. Answer: C.

Q18. With C unavailable, the best route is:
A-B-E-F = 4 + 7 + 3 = 14 hours.

Therefore the minimum travel time is 14 hours. Answer: B.

Q19. The minimum-time routes are:
A-C-E-F
A-B-C-E-F

The intermediate hubs common to both are C and E.
Answer: C.

Q20. A route visiting both D and E can achieve 14 hours:
A-C-D-E-F = 6 + 3 + 2 + 3 = 14.

No 13-hour route contains both D and E.
Answer: B.

MBA4U.in | CAT DILR Practice Set 01 | Original Practice Material

Completed today's practice? Follow Instruction Tomorrow (12 Noon) at "CAT 2026 Preparation" for Day 48 event.

Scroll to Top