MBA4U.in - Day 33 Mixed Sectional Test
45 Original CAT-Level Questions | 15 VARC + 15 DILR + 15 QA
Today’s Mission: Mixed Sectional Test – Compare Accuracy and Time Spent
Total Questions | VARC | DILR | QA | Suggested Time |
45 | 15 | 15 | 15 | 75 minutes |
Practice Instructions
- This is a static MBA4U.in practice paper; it is not an official CAT paper and contains no interactive response fields.
- Suggested sectional time: VARC 25 minutes, DILR 25 minutes, QA 25 minutes. You may also use one continuous 75-minute timer.
- Suggested CAT-style marking: +3 for a correct answer, -1 for an incorrect MCQ, and no negative marking for TITA/non-MCQ.
- Attempt the paper before consulting the answer key. Record attempts, accuracy and time separately for VARC, DILR and QA.
- Difficulty labels are provided only for practice analytics.
Section I – VARC (15 Questions)
Reading Comprehension 1: Standards, Repair and Product Design (Questions 1-3)
When a household appliance fails, the immediate question is often whether the damaged component can be replaced. Yet repairability depends on more than the availability of a spare part. A product may use standard screws but hide them beneath glued panels; a battery may be technically removable but paired by software to a specific circuit board; a diagnostic code may exist but be readable only through proprietary equipment. In such cases, the obstacle to repair is not a single component but the architecture of the product and the rules surrounding access to it.
Calls for repair-friendly standards therefore face a difficult design problem. A standard that merely requires manufacturers to sell parts may have little effect if disassembly destroys the casing or if replacement components cannot be authenticated by the device. Conversely, extremely prescriptive rules can freeze one generation of engineering choices and discourage genuinely useful innovations in sealing, miniaturisation or safety. The challenge is to specify outcomes—reasonable access, diagnostic transparency, and functional replacement—without assuming that every product must be built in the same way.
This distinction matters because standards often work best when they create interfaces rather than blueprints. The USB connector, for instance, became useful not because all devices using it were internally identical but because they agreed on a boundary at which different designs could communicate. Repair policy can learn from this logic. Requiring accessible documentation, interoperable diagnostics and replaceable functional modules may preserve design freedom while still reducing needless dependence on a single authorised service network.
Repairability, then, should not be confused with nostalgia for simpler machines. Modern products can remain complex. The policy question is whether complexity is organised so that failure of one element unnecessarily makes the whole product inaccessible.
Q1. Which interpretation best reflects the passage’s position on repair-friendly standards? [MCQ | Moderate]
- Products should be simplified until every component can be repaired with ordinary household tools.
- Repair policy should focus on usable access and interoperability without forcing identical internal designs.
- Manufacturers should be prohibited from using software to manage replacement components.
- Repairability can be achieved only by returning to less complex product architectures.
Q2. The USB example is used primarily to illustrate which principle? [MCQ | Moderate]
- Standards are most successful when they determine the internal architecture of every compliant product.
- A common interface can enable compatibility even when the systems behind that interface differ substantially.
- Miniaturisation is incompatible with repairable product design.
- Hardware standards are more effective than rules concerning documentation or diagnostics.
Q3. Which example most clearly demonstrates the passage’s preferred outcome-based approach to repair regulation? [MCQ | Difficult]
- Two manufacturers use different internal layouts, but both allow safe module replacement with public diagnostics.
- Every manufacturer is required to place the battery in exactly the same position inside the casing.
- A company publishes a parts catalogue but seals the entire device in a way that destroys it during opening.
- A regulator bans all adhesive materials because some adhesives make repair difficult.
Reading Comprehension 2: Insurance, Risk Pools and Predictive Accuracy (Questions 4-6)
Insurance works by pooling uncertain losses. Many people pay relatively small amounts so that the few who suffer large losses can be compensated. From the insurer’s perspective, better prediction appears unambiguously valuable: if each customer’s expected loss can be estimated more precisely, premiums can be matched more closely to risk. But perfect prediction would alter the social character of insurance itself.
Consider a risk that is uncertain for an individual but predictable across a large population. Pooling makes that uncertainty manageable. If technology gradually reveals which individuals will almost certainly incur the loss, the event stops behaving like an insurable risk for those individuals and starts resembling a known future expense. Charging each person the exact expected cost may improve actuarial accuracy while weakening the transfer of risk that gives insurance its value.
This does not mean that insurers should ignore information. Coarse pricing can create its own problems: low-risk customers may leave a pool if they believe they are subsidising others excessively, while poor pricing can threaten the solvency required to pay claims. The relevant question is therefore not whether prediction is good or bad, but how much differentiation a workable insurance system can sustain without dissolving the pool into individually priced certainty.
Public policy often enters precisely at this boundary. Rules may restrict the use of certain predictive variables, subsidise high-risk participants, or require broad participation. Such measures can look inefficient if judged only by the accuracy of individual premiums. Yet they may be rational if the objective is to preserve a functioning pool for risks society does not want converted entirely into personal financial liabilities.
Q4. Why does the passage suggest that more accurate prediction can weaken insurance in some circumstances? [MCQ | Moderate]
- Accurate prediction always causes insurers to underestimate future claims.
- If individual losses become nearly certain, premiums can approach known personal costs rather than pooled uncertain risks.
- Prediction prevents low-risk customers from leaving an insurance pool.
- Insurance requires all customers to face identical probabilities of loss.
Q5. Which policy choice follows most directly from the final paragraph’s reasoning about insurance pools? [MCQ | Moderate-Difficult]
- Requiring insurers to use every available predictor when setting individual premiums.
- Allowing only customers with below-average expected losses to join a pool.
- Limiting use of a highly predictive variable when unrestricted use would make coverage unaffordable for a defined high-risk group.
- Replacing insurance with mandatory individual savings accounts for all predictable expenses.
Q6. Which claim is most compatible with the author’s overall view of risk differentiation? [MCQ | Moderate]
- Actuarial accuracy is the only relevant criterion for evaluating an insurance system.
- Risk differentiation has no legitimate role in insurance pricing.
- A viable insurance system must balance useful risk differentiation against preservation of a meaningful pool.
- Public intervention is justified only when insurers are unable to calculate expected losses.
Reading Comprehension 3: Seed Dormancy and Ecological Timing (Questions 7-9)
A seed that fails to germinate immediately is not necessarily defective. For many plants, dormancy is a strategy for managing uncertainty. A seed may require a period of cold, a sequence of wet and dry conditions, exposure to light, or even chemical cues from smoke before germination becomes likely. These mechanisms prevent all seeds from responding to the first favourable-looking day.
The advantage becomes clearer when weather is unreliable. If every seed in a population germinated after a single rainfall, a brief wet spell followed by drought could destroy an entire generation. Variation in dormancy spreads germination across time, allowing some seeds to remain in the soil as a reserve. Ecologists sometimes describe this reserve as a seed bank, but the banking metaphor can mislead if it suggests passive storage. Seeds age, are eaten, decay, and alter their responsiveness to environmental signals. The bank is dynamic.
Dormancy also complicates restoration projects. Managers may collect seed from a declining species, sow it, observe little emergence and conclude that the material is poor. Yet low immediate germination may reflect an intact dormancy mechanism rather than low viability. Conversely, laboratory treatments that produce rapid germination can create seedlings at a time or place where survival is unlikely.
For this reason, restoration increasingly separates two questions that were once treated as one: Is the seed alive, and under what sequence of conditions is germination adaptive? The first concerns viability; the second concerns ecological timing. Confusing them can make a successful dormancy strategy look like a failure.
Q7. What is the main reason the passage calls the seed-bank metaphor potentially misleading? [MCQ | Easy-Moderate]
- Seeds stored in soil are not necessarily dormant.
- The reserve changes over time through ageing, mortality and changing responsiveness rather than remaining static.
- Only human-managed seed collections can properly be called banks.
- Seed banks contain too few seeds to influence population survival.
Q8. Which observation would best support the passage’s argument about restoration? [MCQ | Moderate]
- A seed lot shows low immediate germination but high viability and strong germination after an appropriate seasonal treatment.
- A seed lot germinates rapidly in the laboratory and survives equally well under every field condition.
- A restoration site contains no dormant seeds of any species.
- All seeds of one species germinate on the same day after collection.
Q9. According to the passage, separating viability from ecological timing helps prevent which error? [MCQ | Moderate]
- Treating every living seed as genetically identical.
- Assuming that low immediate germination necessarily means that the seed is poor or dead.
- Using laboratory tests to estimate whether seeds contain water.
- Collecting seeds from declining plant populations.
Verbal Ability (Questions 10-15)
High-reliability organisations often use checklists, but the checklist is not valuable merely because items are written down. Its main function is to create a shared pause at moments when routine can hide weak signals. A well-designed checklist identifies a small number of critical checks, assigns responsibility, and gives team members permission to speak when something is missing. A list that is too long or used mechanically can become another ritual that people learn to bypass.
Q10. Which option most accurately compresses the paragraph’s argument about checklists? [MCQ | Moderate]
- Checklists improve reliability mainly by increasing the number of tasks teams must document.
- Effective checklists create a focused shared check at critical moments, while overlong or mechanical use can undermine their purpose.
- High-reliability organisations should replace professional judgement with detailed written procedures.
- Checklists are useful only when every team member performs the same task.
Research metrics make comparison easier by compressing complex performance into visible numbers. Citation counts, completion rates or response times can reveal patterns that informal impressions miss. Yet once a metric becomes a target, people may change behaviour to improve the number rather than the underlying outcome. ______
Q11. Which ending preserves the paragraph’s warning about using performance metrics as targets? [MCQ | Moderate]
- Therefore, any metric that changes behaviour should immediately be abandoned.
- The usefulness of measurement depends partly on whether the metric continues to track the objective after people begin optimising for it.
- Consequently, numerical comparison is always less reliable than expert intuition.
- For this reason, organisations should publish only metrics that are impossible to improve.
Q12. Identify the sentence that does not belong in the paragraph about managing urban delivery kerbs. Enter only its number.
1. Delivery vehicles often compete with buses, taxis and private cars for limited kerb space.
2. Time-limited loading zones can reduce double parking when enforcement is predictable.
3. Some cities use booking systems that assign delivery vehicles specific loading windows.
4. Deep-ocean currents redistribute heat across major ocean basins over very long timescales.
5. Kerb policy therefore works best when street space is treated as a scarce resource whose use changes through the day. [TITA | Easy]
Q13. Arrange the following sentences to form a coherent paragraph. Enter the correct four-digit sequence.
1. The new fibres are then pressed into sheets and dried.
2. Recycling paper begins by mixing used paper with water to separate its fibres.
3. Contaminants such as staples, plastic coatings and some inks must be removed from the resulting pulp.
4. The quality of the final sheet therefore depends partly on how effectively the pulp is cleaned before it is re-formed. [TITA | Moderate]
Q14. Arrange the following sentences to form a coherent paragraph. Enter the correct four-digit sequence.
1. That record allows astronomers to compare a star’s present brightness with observations made decades earlier.
2. Before digital detectors became standard, observatories recorded much of the night sky on photographic plates.
3. Many plate archives are now being scanned so that measurements once locked in physical collections can be analysed computationally.
4. Although each plate captures only one observation, large archives together form a long historical record of changing stars. [TITA | Moderate]
Q15. Arrange the following sentences to form a coherent paragraph. Enter the correct four-digit sequence.
1. When demand rises unexpectedly, stored water can be released without waiting for new rainfall.
2. A reservoir separates the timing of water collection from the timing of water use.
3. This buffering role is valuable because rainfall and human demand rarely peak at exactly the same time.
4. During wetter periods, inflow can be retained rather than passed immediately downstream. [TITA | Moderate]
Section II – DILR (15 Questions)
Set 1: Meal-Kit Orders and Contribution (Questions 16-20)
A meal-kit company tracks five plans. For each plan, the table gives orders received, the percentage cancelled before dispatch, and the contribution earned per delivered order. All percentages apply exactly.
Plan | Orders | Cancelled (%) | Contribution per delivered order (Rs) |
A | 400 | 5 | 90 |
B | 360 | 10 | 100 |
C | 500 | 8 | 80 |
D | 450 | 12 | 95 |
E | 300 | 4 | 110 |
Q16. How many orders are delivered across all five plans? [TITA | Moderate]
Q17. Which plan generates the highest total contribution from delivered orders? [MCQ | Moderate]
- Plan A
- Plan B
- Plan C
- Plan D
Q18. What percentage of the combined orders for Plans A and B are cancelled? [MCQ | Moderate]
- 7.00%
- 7.37%
- 7.50%
- 8.00%
Q19. If Plan C reduces its cancellation rate from 8% to 4%, with orders and contribution per delivered order unchanged, by how many rupees does its total contribution increase? [TITA | Moderate]
Q20. If Plan E’s contribution per delivered order increases by 10% with all other figures unchanged, what is Plan E’s new total contribution, in rupees? [TITA | Moderate]
Set 2: Analyst Duty Roster (Questions 21-25)
Five analysts A, B, C, D and E each work on exactly two of Monday, Tuesday, Wednesday, Thursday and Friday. Exactly two analysts work on each day. The following conditions hold: A works on Monday but not Friday; B works on Tuesday; C works on Wednesday; D works on Friday; E does not work on Monday; A and C work together on exactly one day; C and E work together on exactly one day.
Q21. Across all feasible assignments, what is the total number of complete weekly rosters? [TITA | Difficult]
Q22. If A works on Wednesday, which pair must work on Thursday? [MCQ | Moderate]
- B and D
- B and E
- C and D
- C and E
Q23. If B works on Thursday, on which two days must E work? [MCQ | Moderate]
- Tuesday and Wednesday
- Tuesday and Friday
- Wednesday and Friday
- Thursday and Friday
Q24. In how many valid rosters does D work on Tuesday? [TITA | Moderate]
Q25. If D works on Monday, which analyst must work on Thursday? [MCQ | Difficult]
- A
- B
- C
- E
Set 3: Campus Shuttle Passenger Flow (Questions 26-30)
A campus shuttle travels in order A-B-C-D-E-F. It starts empty at A and ends its route at F. The table shows passengers boarding and alighting at each stop. Segment distances are AB=3 km, BC=4 km, CD=2 km, DE=5 km and EF=3 km.
Stop | Board | Alight |
A | 32 | 0 |
B | 18 | 10 |
C | 12 | 22 |
D | 25 | 15 |
E | 8 | 28 |
F | 0 | 20 |
Q26. How many passengers board the shuttle over the entire route? [TITA | Easy]
Q27. What is the maximum number of passengers on board on any segment? [TITA | Moderate]
Q28. What is the total passenger-kilometre load over the full route? [TITA | Difficult]
Q29. Suppose five fewer passengers alight at D, with all boardings unchanged. How many passengers would then travel on segment DE? [TITA | Moderate]
Q30. What fraction of the original total passenger-kilometre load is contributed by segment DE? [MCQ | Difficult]
- 5/18
- 25/72
- 3/8
- 5/12
Section III – QA (15 Questions)
Q31. A 1.2 kg pack is priced at Rs 240. The pack size is reduced to 1.05 kg while the price is increased to Rs 252. By what percentage does the price per kilogram increase? [MCQ | Easy]
- 15%
- 18%
- 20%
- 22%
Q32. A factory has a fixed daily operating cost plus a constant variable cost per unit. At an output of 600 units, the average cost is Rs 140 per unit; at 1,000 units, the average cost is Rs 116 per unit. What is the fixed daily operating cost, in rupees? [TITA | Moderate]
Q33. A vessel contains acid and water in the ratio 3:7. After 20 litres of water evaporate, acid forms 37.5% of the mixture. What was the original volume of the mixture, in litres? [TITA | Moderate]
Q34. If sqrt(x+9) – sqrt(x) = 1 for x>=0, what is x? [TITA | Easy]
Q35. For the equation (x-1)(x-2)(x-3)(x-4)=24, determine the sum of its real roots. [TITA | Moderate-Difficult]
Q36. For a sequence, the sum of the first n terms is S_n=3n^2+2n. What is the 10th term? [TITA | Moderate]
Q37. Determine the smallest value of n such that the prime-factorisation of n! contains at least ten factors of 2 and five factors of 3. [TITA | Moderate]
Q38. In how many ways can 100 be expressed as the sum of two or more consecutive positive integers? [TITA | Moderate-Difficult]
Q39. A square is inscribed in a semicircle of radius 5 cm so that one side of the square lies on the diameter and the two opposite vertices lie on the semicircular arc. What is the side length of the square? [MCQ | Moderate]
- sqrt(10) cm
- 2sqrt(5) cm
- 5/sqrt(2) cm
- 4 cm
Q40. The three lines x=2, y=3 and x+y=10 bound a triangle. What is the area of this triangle, in square units? [MCQ | Moderate]
- 10
- 12.5
- 15
- 17.5
Q41. Two distinct cards are chosen uniformly at random from cards numbered 1 through 9. What is the probability that the sum of the two numbers is divisible by 3? [MCQ | Moderate]
- 1/4
- 1/3
- 5/12
- 1/2
Q42. A fair six-sided die is rolled repeatedly until the first 6 appears. What is the probability that the first 6 appears on an even-numbered roll? [MCQ | Moderate-Difficult]
- 4/11
- 5/11
- 1/2
- 6/11
Q43. A cyclic quadrilateral has side lengths 5 cm, 5 cm, 7 cm and 7 cm. What is its area, in square centimetres? [TITA | Difficult]
Q44. An integer is chosen uniformly at random from 1 to 100. What is the probability that the units digit of its square is the same as the units digit of the integer itself? [MCQ | Moderate]
- 1/5
- 3/10
- 2/5
- 1/2
Q45. In triangle ABC, AB=13 cm, AC=15 cm and BC=14 cm. If G is the centroid, what is AG? [MCQ | Difficult]
- 2sqrt(37)/3 cm
- 4sqrt(37)/3 cm
- 2sqrt(37) cm
- 4sqrt(37) cm
Answer Key
Q | Ans | Q | Ans | Q | Ans |
1 | B | 16 | 1848 | 31 | C |
2 | B | 17 | D | 32 | 36000 |
3 | A | 18 | B | 33 | 100 |
4 | B | 19 | 1600 | 34 | 16 |
5 | C | 20 | 34848 | 35 | 5 |
6 | C | 21 | 9 | 36 | 59 |
7 | B | 22 | D | 37 | 12 |
8 | A | 23 | C | 38 | 2 |
9 | B | 24 | 4 | 39 | B |
10 | B | 25 | C | 40 | B |
11 | B | 26 | 95 | 41 | B |
12 | 4 | 27 | 40 | 42 | B |
13 | 2314 | 28 | 576 | 43 | 35 |
14 | 2431 | 29 | 45 | 44 | C |
15 | 2413 | 30 | B | 45 | B |
Detailed Solutions and Explanations
Q1. Answer: B. The passage argues against equating repairability with one mandated internal design. It favours outcome requirements such as access, diagnostics and functional replacement while leaving manufacturers room to implement them differently. Hence B.
Q2. Answer: B. USB is presented as a boundary standard: different devices can have different internals while still communicating through an agreed interface. Hence B.
Q3. Answer: A. Option A directly demonstrates the author’s preferred approach: different designs achieve the same repair outcomes. B is a blueprint, while C and D show poorly designed or over-prescriptive rules.
Q4. Answer: B. The passage says that when prediction makes an individual’s loss nearly certain, the premium begins to resemble that person’s known future expense rather than a transfer of uncertain risk. Hence B.
Q5. Answer: C. The final paragraph accepts restrictions on predictors when they help preserve a workable pool. Option C states exactly such a case.
Q6. Answer: C. The author rejects both extremes. Some differentiation is necessary for incentives and solvency, but too much can dissolve pooling. Hence C.
Q7. Answer: B. The metaphor is misleading because seeds in soil do not simply sit unchanged: they age, die, are consumed and change their responses. Hence B.
Q8. Answer: A. High viability with delayed germination after an appropriate cue shows that low immediate emergence can reflect dormancy rather than poor seed quality. Hence A.
Q9. Answer: B. The central warning is that low immediate germination can be misread as low viability when it may instead be adaptive timing. Hence B.
Q10. Answer: B. The paragraph says useful checklists create a focused shared pause and support speaking up; long mechanical lists can become empty rituals. B preserves both points.
Q11. Answer: B. The paragraph moves from the value of metrics to Goodhart-like distortion once people optimise for the number. B completes that logic without rejecting measurement altogether.
Q12. Answer: 4. Sentences 1, 2, 3 and 5 all concern allocation of urban kerb space for deliveries. Sentence 4 concerns ocean circulation, so the answer is 4.
Q13. Answer: 2314. Sentence 2 introduces pulping. Sentence 3 follows with cleaning the pulp. Sentence 1 then describes forming sheets, and sentence 4 draws the quality implication. Order: 2314.
Q14. Answer: 2431. Sentence 2 introduces photographic plates. Sentence 4 explains how many plates form a historical record. Sentence 3 describes digitising those archives, and sentence 1 explains what that record enables. Order: 2431.
Q15. Answer: 2413. Sentence 2 introduces the reservoir’s timing function. Sentence 4 describes storing water in wet periods, sentence 1 describes releasing it during demand, and sentence 3 explains why this buffering matters. Order: 2413.
Q16. Answer: 1848. Delivered orders are A=400(0.95)=380, B=360(0.90)=324, C=500(0.92)=460, D=450(0.88)=396 and E=300(0.96)=288. Total=380+324+460+396+288=1848.
Q17. Answer: D. Total contributions are A=380×90=34,200; B=324×100=32,400; C=460×80=36,800; D=396×95=37,620; E=288×110=31,680. Plan D is highest.
Q18. Answer: B. Cancelled orders are 20 for A and 36 for B, total 56 out of 760 orders. 56/760 x100 = 7.368…%, approximately 7.37%. Hence B.
Q19. Answer: 1600. At 8% cancellation, C delivers 460. At 4%, it delivers 480, an increase of 20 deliveries. Extra contribution=20×80=Rs 1,600.
Q20. Answer: 34848. E delivers 288 orders. A 10% increase changes contribution per delivery from Rs 110 to Rs 121. Total=288×121=Rs 34,848.
Q21. Answer: 9. Enumerating the two-day assignments subject to two analysts per day and all seven constraints gives exactly 9 valid rosters.
Q22. Answer: D. Among the valid rosters in which A also works Wednesday, Thursday is occupied by C and E in every case. Hence D.
Q23. Answer: C. If B’s second day is Thursday, the constraints and daily staffing counts force E to work Wednesday and Friday. Hence C.
Q24. Answer: 4. Across the 9 valid rosters, D works Tuesday in 4 of them.
Q25. Answer: C. If D works Monday, the remaining staffing constraints force C to be one of the two analysts on Thursday in every feasible roster. Hence C.
Q26. Answer: 95. Total boardings=32+18+12+25+8=95.
Q27. Answer: 40. Loads after each stop for the next segment are 32, 40, 30, 40 and 20. The maximum is 40.
Q28. Answer: 576. Passenger-km =32×3 +40×4 +30×2 +40×5 +20×3 =96+160+60+200+60=576.
Q29. Answer: 45. Originally 15 alight at D, leaving 40 after 25 board. If only 10 alight, the load on DE increases by 5 to 45.
Q30. Answer: B. Segment DE contributes 40×5=200 passenger-km out of 576. 200/576=25/72. Hence B.
Q31. Answer: C. Old price per kg=240/1.2=Rs 200. New price per kg=252/1.05=Rs 240. Increase=(40/200)x100=20%. Hence C.
Q32. Answer: 36000. Let fixed cost be F and variable cost per unit be v. F+600v=600×140=84,000 and F+1000v=1,000×116=116,000. Subtracting gives 400v=32,000, so v=80. Hence F=84,000-600×80=Rs 36,000.
Q33. Answer: 100. Let original volume be V litres. Acid=0.3V and remains unchanged. After 20 litres of water evaporate, total=V-20 and acid fraction is 0.375. Thus 0.3V=0.375(V-20), giving V=100.
Q34. Answer: 16. sqrt(x+9)=sqrt(x)+1. Squaring gives x+9=x+1+2sqrt(x), so sqrt(x)=4 and x=16.
Q35. Answer: 5. Let t=x^2-5x+5. Then (x-1)(x-4)=t-1 and (x-2)(x-3)=t+1, so (t-1)(t+1)=24. Hence t^2=25. If t=5, x^2-5x=0, giving x=0 or 5. If t=-5, x^2-5x+10=0 has no real roots. The sum of all real solutions is 5.
Q36. Answer: 59. a_n=S_n-S_{n-1}. Thus a_n=(3n^2+2n)-[3(n-1)^2+2(n-1)]=6n-1. Hence a_10=59.
Q37. Answer: 12. For 12!, v_2=floor(12/2)+floor(12/4)+floor(12/8)=6+3+1=10 and v_3=floor(12/3)+floor(12/9)=4+1=5. For n<12 the power of 2 is insufficient, so n=12.
Q38. Answer: 2. A positive integer has a representation as consecutive positive integers for each suitable factorisation. Here 100=18+19+20+21+22 and 100=9+10+11+12+13+14+15+16. These are the only representations with at least two terms, so the answer is 2.
Q39. Answer: B. Let square side be s. From the semicircle centre to a top vertex, horizontal distance is s/2 and vertical distance is s. Thus (s/2)^2+s^2=25, so 5s^2/4=25 and s=2sqrt(5). Hence B.
Q40. Answer: B. The lines meet at (2,3), (2,8) and (7,3). This is a right triangle with perpendicular legs 5 and 5, so area=(1/2)x5x5=12.5 square units. Hence B.
Q41. Answer: B. Modulo 3, the cards form three classes of size 3: {3,6,9}, {1,4,7} and {2,5,8}. A sum divisible by 3 comes from two cards in the first class [C(3,2)=3 ways] or one from each of the other two classes [3×3=9 ways]. Favourable pairs=12 out of C(9,2)=36, so the probability is 1/3. Hence B.
Q42. Answer: B. For the first 6 to occur on roll 2k, the first 2k-1 rolls must be non-6 and roll 2k must be 6. The probability is (5/6)(1/6)+(5/6)^3(1/6)+… = (5/36)/[1-25/36]=(5/36)/(11/36)=5/11. Hence B.
Q43. Answer: 35. For a cyclic quadrilateral, Brahmagupta’s formula gives area=sqrt[(s-a)(s-b)(s-c)(s-d)]. Here s=(5+5+7+7)/2=12, so area=sqrt(7x7x5x5)=35 square centimetres.
Q44. Answer: C. A digit d satisfies d^2 ending in d exactly for d=0,1,5,6. Among 1 to 100, each units digit occurs 10 times, so 40 of the 100 integers qualify. Probability=40/100=2/5. Hence C.
Q45. Answer: B. The median from A to side BC has length m_a=(1/2)sqrt(2(13^2)+2(15^2)-14^2)=(1/2)sqrt(592)=2sqrt(37). The centroid divides a median in the ratio 2:1 from the vertex, so AG=(2/3)m_a=4sqrt(37)/3. Hence B.